Turret ring repairs on the M-4a3 Sherman .

View of the basket with the turret off.
Robert prepares the LVS to pick up the turret.
Marc moves the turret out of the shop area.
Up and over with 4 tons of steel.
Just about lined up.
Jerry helps Marc in final line up.
Down it goes to be bolted to the turret ring.
The turret works much smoother now.